An extensive feasibility study found there are 3 generic ways to reduce the risk of contaminating the drinking water stored at the Levine Reservoir. Here’s a snapshot of each of the solutions and their related costs.
Visit this link to read the complete feasibility study. (18 MB)
Click/Touch to view enlargement